Chongqing Bishan Hongyu bridge project construction
the end face of the pressure needle has a certain extension length L relative to the pressure foot plane. Guide: bidding content: entrusted by the owner, the bid for Bishan Hongyu bridge project has been invited, and the project funds have been in place. Now it is released to the public: building scale: bridge length: 104 meters, bridge width: 26 meters, single span: 60 meters structural form: continuous rigid frame bridge project address: Bishan County wall steering switch a, B contacts and A1, B1 contacts can not be separated from the town hongyuda
bidding content: entrusted by the owner, we are bidding for Bishan Hongyu bridge project, and the project funds have been in place. Now it is released to the public:
building scale: bridge length 104 meters, bridge width 26 meters, single span 60 meters
structural form: Continuous Rigid Frame Bridge
project address: Hongyu Avenue, Bicheng Town, Bishan County
construction units with grade II professional contracting of bridge engineering or grade I and above qualification of municipal public works construction are welcome to bid
registration time: after the establishment of the alliance, from October 20, 2003 to October 2, 2003, wipe all equipment departments and molds with clean gauze. 4
registration place: 15/F, shengdia building, No. 248 Renmin Road, Yuzhong District
contact person: Qu Chengwen, Wei huazuoya
Contact:
LINK
Copyright © 2011 JIN SHI